投资策划网—规模最大、实力最强的研究报告提供商! 关于我们 联系中撰 网站地图
稳评报告
当前位置:主页 > 稳评报告 > >> Proposal for Research on Dairy Cattle Rearing and Equipment
Proposal for Research on Dairy Cattle Rearing and Equipment
2017-11-23 10:10共有人浏览
更多
内 容
 

【报告目录】

 :
【Report Name】:Proposal for Research on Dairy Cattle Rearing and Equipment Situation in China
【Published】:Dec/2018
【Report Code】:SN
【Form】: PDF or Hard copy  
【Delivery】: E-mail or EMS
【Report Price】:PDF Copy: 660USD
Research Background & Research Ideas
China is the third largest milk producer in the world, behind India and USA, and contributes about 5% of the world’s total milk products output. China focuses on the production of cow milk, which accounts for over 90% of the total milk production. In addition, China has the third largest dairy cattle inventory in the world, behind India and Brazil.
In 2017, China’s dairy cattle inventory amounted to 12.6 million heads and milk production reached 35.75 million MT, both accounting for 5% of the world’s total. Only second to live hog, Cattle and broiler, dairy cattle is also an important rearing species in China, involves large number of farmers and owns broad market.
To increase rearing profit and guarantee milk quality, China’s dairy cattle rearing method is gradually changing from widely scattered small-scale rearing into scaled rearing; more and more rearing communities and modern farms have been built. Some large dairy enterprises also extend operation range to dairy cattle rearing in order to obtain stable and high quality raw milk. So, the growers, size, methods and mechanization level of dairy cattle rearing all are experiencing tremendous changes.
How have China’s dairy cattle inventory and distribution changed in the past 3 years. How about the farmer number of difference scale and the inventory they own? What kind of rearing method and equipments are used by farmers of different scale and how about the popularity of automation equipments? Which factors can affect farmers in equipment purchasing? Who are China’s major dairy cattle rearing equipments suppliers and how much market share they own? Who are the top 20 dairy cattle rearing enterprises?
Based on in-depth survey, systematic analysis and scientific generalization, this report is shown by detailed and accurate content, terse language, clear charts and definite standpoints as references to analyse the above questions so as to help client understand the situation of dairy cattle rearing and equipments, acknowledge the features of market changes and get forecast of the future market trend.
TABLE OF CONTENTS
I RESEARCH BACKGROUND & RESEARCH IDEAS I
1 CHINA’S DAIRY CATTLE INVENTORY & DISTRIBUTION BY PROVINCE 1
1.1 Dairy Cattle Inventory and Rearing Species 1
1.1.1 Change of Dairy Cattle Inventory 1
1.1.2 Dairy Cattle Rearing Species 1
1.2 Changes of Milk Output in China 2
1.3 Concentrations of Milk Output by Province 2
2 CHINA’S DAIRY CATTLE REARING MODES & MILK DELIVERY MODES 4
2.1 Rearing Modes of Dairy Cattle Farms 4
2.1.1 Small Farmer Farming 4
2.1.2 Dairy Cooperative Farming 4
2.1.3 Dairy Cattle Farming Community 5
2.1.4 Dairy Cattle Farming Union 6
2.1.5 Dairy Cattle Farming Base 7
2.2 Delivery Modes of Fresh Milk in China 7
3 DAIRY CATTLE INVENTORY & PRODUCER NUMBER OF DIFFERENT SCALE 9
3.1 Dairy Cattle Rearing Scales and Ranking Standard 9
3.2 Dairy Cattle Inventory of Different Scale in 2017 9
3.3 Number of Dairy Cattle Farms of Different Scale in 2017 10
3.4 Distribution of Cattle Farms by Province 11
3.5 Rearing Methods & Modes of Farms of Different Scale 12
3.5.1 Rearing Modes of Farms of Different Scale 12
3.5.2 Rearing Methods of Farms of Different Scale 13
3.6 Milk Delivery Channels of Farms of Different Scale 15
4 FEATURES & TRENDS OF CHANGES OF DAIRY CATTLE REARING ENTERPRISES 16
4.1 Features of Changes of Dairy Cattle Farm Number 16
4.2 Features of Changes of Dairy Cattle Farm Scale 17
4.3 Features of Changes of Dairy Cattle Farm Distribution 18
5 EQUIPMENTS FOR DAIRY CATTLE REARING IN CHINA 18
5.1 Features of Rearing Equipments of Different Rearing Scale 18
5.2 Proportion of Automation Equipment in Dairy Cattle Rearing 20
6 INFLUENCING FACTORS IN EQUIPMENT PROCUREMENT 21
6.1 Factors of Influencing on Farmers’ Equipment Procurement 21
6.1.1 Farm-related Factors 21
6.1.2 Equipment-related Factors 22
6.1.3 Market-related & Government’s Policies Factors 23
6.2 Influencing Factors upon Equipment Purchasing for Farms of Different Scales 24
6.2.1 Free-range Farms& Small-scale Farms 24
6.2.2 Medium-scale Farms 24
6.2.3 Large -scale Farms 24
7 POLICY AND COST DIFFERENCE IN PURCHASING HOME-MADE & FOREIGN EQUIPMENTS 25
7.1 Government’s Policy Difference in Purchasing Home-made & Foreign Equipments 25
7.2 Cost Difference in Purchasing Home-made & Foreign Equipments 25
8 CHINA’S TOP 10 DAIRY CATTLE REARING EQUIPMENT SUPPLIERS & MARKET SHARE 26
8.1 2017 Output Value of Dairy Cattle Equipments in China 26
8.2 2017 Output Value of Top 10 Dairy Cattle Equipment Suppliers 28
8.3 Features of Dairy Cattle Rearing Equipments Market 30
8.3.1 Low Market Concentration Rate, Top 10 Enterprises Cover Only 20% Market Share 30
8.3.2 Large Cattle Equipment Enterprises Mainly Sell Milking Facilities 31
8.3.3 Large Cattle Farming Equipment Enterprises Mainly Overseas-funded 31
8.3.4 Large-scale Cattle Farming Equipment Enterprises Concentrate in Shanghai 31
8.3.5 Large Dairy Cattle Equipment Enterprises Mainly Professional Enterprises 32
8.3.6 Farming Management Software to Be the Focus of Development 32
8.3.7 All Enterprises Import Core Parts of Milking Equipment and Full Set of Feeding Equipment 33
8.3.8 Scientific & Efficient Automatic Feeding Technique to Be the Focus of Development 33
8.4 Top 10 Dairy Cattle Equipments Suppliers in China 33
8.4.1 DeLaval (Shanghai) Co., Ltd. 33
8.4.1.1 Supplier Profile 33
8.4.1.2 Equipment Source of Supplier 34
8.4.1.3 Sales Value & Market Share of Cattle Rearing Equipment in 2017 34
8.4.2 GEA (Shanghai) Farm Technologies Co., Ltd. 35
8.4.2.1 Supplier Profile 35
8.4.2.2 Equipment Source of Supplier 36
8.4.2.3 Sales Value & Market Share of Cattle Rearing Equipment in 2017 36
8.4.3 BouMatic Co., Ltd. 37
8.4.3.1 Supplier Profile 37
8.4.3.2 Equipment Source of Supplier 38
8.4.3.3 Sales Value & Market Share of Cattle Rearing Equipment in 2017 38
8.4.4 Beijing Kingpeng Global Husbandry Technology Co., Ltd. 39
8.4.4.1 Supplier Profile 39
8.4.4.2 Equipment Source of Supplier 39
8.4.4.3 Sales Value & Market Share of Cattle Rearing Equipment in 2017 40
8.4.5 S.A.E Afikim 40
8.4.5.1 Supplier Profile 40
8.4.5.2 Equipment Source of Supplier 41
8.4.5.3 Sales Value & Market Share of Cattle Rearing Equipment in 2017 41
8.4.6 Storti (Beijing) Cattle Feeding Machines Co., Ltd. 42
8.4.6.1 Supplier Profile 42
8.4.6.2 Equipment Source of Supplier 42
8.4.6.3 Sales Value & Market Share of Cattle Rearing Equipment in 2017 43
8.4.7 Shanghai I-Orion Machinery Co., Ltd. 43
8.4.7.1 Supplier Profile 43
8.4.7.2 Equipment Source of Supplier 43
8.4.7.3 Sales Value & Market Share of Cattle Rearing Equipment in 2017 44
8.4.8 Shanghai Doublewin Agri Co., Ltd. 44
8.4.8.1 Supplier Profile 44
8.4.8.2 Equipment Source of Supplier 45
8.4.8.3 Sales Value & Market Share of Cattle Rearing Equipment in 2017 45
8.4.9 Guangzhou Wanri Milking Systems Co., Ltd 45
8.4.9.1 Supplier Profile 45
8.4.9.2 Equipment Source of Supplier 46
8.4.9.3 Sales Value & Market Share of Cattle Rearing Equipment in 2017 46
8.4.10 Shanghai Milkows Equipment Co., Ltd. 46
8.4.10.1 Supplier Profile 46
8.4.10.2 Equipment Source of Supplier 47
8.4.10.3 Sales Value & Market Share of Cattle Rearing Equipment in 2017 47
9 TOP 20 DAIRY CATTLE REARING ENTERPRISES 47
9.1 Distribution of Top 20 Dairy Cattle Farming Enterprises and Milk Output 47
9.1.1 Distribution of Top 20 Dairy Cattle Farming Enterprises 47
9.1.2 Total Milk Output of Top 20 Enterprises & Proportion for Each 48
9.2 Production Features of Top20 Dairy Cattle Rearing Enterprises 49
9.2.1 Some Farming Enterprises Introduce Holstan Cattle from Abroad 49
9.2.2 Almost All the 20 Enterprises Adopt Free Enclosure Farming 49
9.2.3 Single Farm Inventory Usually 1,000~3,000 Heads, A Few Farms Exceed 10,000Heads 50
9.2.4 Most Farming Enterprises Realize Automatic Feeding&Milking, Milk Yield Relatively High 50
9.2.5 Taking Manure Disposal as Important Leads to Big Investment in Equipments 50
9.2.6 Most Enterprises Own Scaled Farming Bases, A few Realize Integration of Farming and Processing 51
9.2.7 Most Enterprises Have Close Relationship with Large-scale Dairy Processing Enterprises 51
9.3 Profile & Milk Output of Top 20 Dairy Cattle Rearing Enterprises 52
9.3.1 Yili Dairy Farm Co., Ltd 52
9.3.2 Mengniu Group Raw Milk Devision 53
9.3.3 Modern Farming (Group) Co., Ltd 54
9.3.4 Liaoning Huishan Holdings (Group) Co., Ltd. 56
9.3.5 Nanjing Weigang Dairy Co., Ltd. 57
9.3.6 Inner Mongolia Shengmu High-Tech Dairy Industry Co., Ltd. 58
9.3.7 Beijing Sanyuan Lvhe-Dairy Cattle Center 58
9.3.8 Shanhai Dairy Group Co., Ltd. 60
9.3.9 Fujian Changfu Dairy Industry Group Co., Ltd. 63
9.3.10 Heilongjiang Feihe Feedlots Co., Ltd 64
9.3.11 Shanghai Bright Holstan Co., Ltd. 65
9.3.12 Tianjin Jialihe Dairy Farm Co., Ltd. 66
9.3.13 Jilin Province Milk Industry Group Guangze Cattle Farming Co., Ltd 67
9.3.14 Inner Mongolia Dairy United Science &Technology Co., Ltd. 68
9.3.15 VV Agriculture&Stock Raising Science and Technology Co., Ltd. 69
9.3.16 Fortune Ng Fung Breeding (Yanjiao) Co., Ltd. 70
9.3.17 Zhongxing Dairy Industry Co., Ltd. 71
9.3.18 Huaxia (Sanhe) Dairy Farm Co., Ltd. 72
9.3.19 Fonterra Tangshan Dairy Farm Co., Ltd. 73
9.3.20 Jinan Jiabao Milk Co., Ltd. 75

MAP CONTENTS
Map 1, Milk Production Distribution by Province in China 3
Map 2, Milk Production Distribution by County in China 3
Map 3, China’s Distribution of Cattle Farms by Province, 2017 11
Map 4, China’s Distribution of Cattle Farms of Different Size by Province, 2017 12
Map 5, Distribution of TOP 10 Largest Cattle Equipment Suppliers in China, 2017 30
Map 6, Distribution of TOP 20 Laugest Cattle Rearing Enterprises in China, 2017 48

FIGURE CONTENTS
Figure 1, Change of Cattle Inventory in China, 1973-2017 1
Figure 2, Change of Milk Production in China, 1973-2017 2
Figure 3, Dairy Cooperative Farming Mode of Cattle in China 5
Figure 4, Dairy Cattle Farming Community Mode of Cattle in China 6
Figure 5, Dairy Cattle Farming Union Mode of Cattle in China 6
Figure 6, Main Delivery Mode of Raw Milk in China 7
Figure 7, Raw Milk Delivery Pattern of Different Farming Modes in China 8
Figure 8, Cattle Invertory of Different Sizes in China, 2017 10
Figure 9, Milk Delivery Channels for Farms of Different Sizes in China 16
Figure 10, Influencing Factors on Cattle Farmers’ Equipment Procurement 21

ATTACHED TABLES
Table 1, The Distinction of Different Scaled of Small Farmer Farming 4
Table 2, Management Mode of Milk Collection Station for Dairy Enterprises 8
Table 3, The Standard of Different Cattle Inverntory Sizes 9
Table 4, Central Government’s Subsidy for Different Scaled Cattle Farms, 2017 9
Table 5, The Cattle Farms Quantity of Different Sizes 10
Table 6, Rearing Modes Difference by Sizes 13
Table 7, Rearing Methods Difference by Sizes 14
Table 8, Milk Delivery Channels & Proportion of Farms of Different Scale 15
Table 9, Change in Quantity of Cattle Farms of Different Sizes, 2014 & 2017 17
Table 10, Change in Cattle Inventory and Proportion of Different Sizes, 2014 & 2017 17
Table 11, Usage of Rearing Equipment for Cattle by Size 19
Table 12, Proportion of Using Automated Equipment for Cattle Farms by Size 20
Table 13, Influencing Factors on Equipment Procurement of Different Scaled Farmers 24
Table 14, Calculations for Output Value of Cattle Equipment, 2017 28
Table 15, Top 10 Largest Cattle Equipment Suppliers & Market Share in China 29
Table 16, Main Cattle Equipments of DeLaval (Shanghai) Co., Ltd. 34
Table 17, Some Projects of Delaval(shanghai) Co., Ltd. 35
Table 18, Main Cattle Equipments of GEA (Shanghai) Farm Technologies Co., Ltd. 36
Table 19, Some Projects of GEA (Shanghai) Farm Technologies Co., Ltd. 37
Table 20, Main Cattle Equipments of BouMatic Co., Ltd. 38
Table 21, Some Projects of BouMatic Co., Ltd. 38
Table 22, Main Cattle Equipments of Beijing Kingpeng Global Husbandry Technology Co., Ltd. 39
Table 23, Some Projects of Beijing Kingpeng Global Husbandry Technology Co., Ltd. 40
Table 24, Main Cattle Equipments of S.A.E Afikim 41
Table 25, Some Projects of S.A.E Afikim 41
Table 26, Main Cattle Equipments of Storti (Beijing) Cattle Feeding Machines Co., Ltd. 42
Table 27, Main Cattle Equipments of Shanghai I-Orion Machinery Co., Ltd 43
Table 28, Some Projects of Shanghai I-Orion Machinery Co., Ltd 44
Table 29, Main Cattle Equipments of Shanghai Doublewin Agri Co., Ltd. 44
Table 30, Some Projects of Shanghai Doublewin Agri Co., Ltd. 45
Table 31, Main Cattle Equipments of Guangzhou Wanri Milking Systems Co., Ltd 45
Table 32, Some Projects of Guangzhou Wanri Milking Systems Co., Ltd 46
Table 33, Main Cattle Equipments of Shanghai Milkows Equipment Co., Ltd. 47
Table 34, China’s Top 20 Largest Cattle Rearing Enterprises 49
Table 35, Cattle Inventory & Milk Production of Yili Dairy Farm Co., Ltd., 2017 53
Table 36, Cattle Inventory & Milk Production of Mengniu Group Raw Milk Division, 2017 54
Table 37, Profile of Modern Farming (Group) Co., Ltd. 55
Table 38, Cattle Inventory & Milk Production of Modern Farming (Group) Co., Ltd., 2017 55
Table 39, Cattle Inventory & Milk Production of Liaoning Huishan Holdings (Group) Co., Ltd., 2017 56
Table 40, Cattle Inventory & Milk Production of Nanjing Weigang Dairy Co., Ltd., 2017 57
Table 41, Profile of Equipment in Nanjing Weigang Dairy Co., Ltd. 58
Table 42, Cattle Inventory & Milk Production ofInner Mongolia Shengmu High-Tech Dairy Industry Co., Ltd., 2017 58
Table 43, Cattle Inventory of Each Farms of Beijing Sanyuan Lvhe-Dairy Cattle Center 59
Table 44, Cattle Inventory & Milk Production of Beijing Sanyuan Lvhe-Dairy Cattle Center, 2017 60
Table 45, Profile of Shanhai Dairy Group Co., Ltd. 61
Table 46, Cattle & Grown Cattle Inventory of Shanhai Dairy Group Co., Ltd., 2017 62
Table 47, Cattle Inventory & Milk Production of Fujian Changfu Dairy Industry Group Co., Ltd., 2017 63
Table 48, Cattle Inventory of Heilongjiang Feihe Feedlots Co., Ltd., 2017 64
Table 49, Profile of Shanghai Bright Holstan Co., Ltd. 65
Table 50, Cattle & Grown Cattle Inventory of Shanghai Bright Holstan Co., Ltd., 2017 66
Table 51, Cattle & Grown Cattle Inventory of Tianjin Jialihe Dairy Farm Co., Ltd., 2017 67
Table 52, Cattle Inventory & Milk Production of Jilin Province Milk Industry Group Guangze Cattle Farming Co., Ltd., 2017 68
Table 53, Cattle Inventory & Milk ProductionInner of Mongolia Dairy United Science &Technology Co., Ltd., 2017 69
Table 54, Cattle Inventory & Milk Production of VV Agriculture&Stock Raising Science and Technology Co., Ltd., 2017 70
Table 55, Profile of Fortune Ng Fung Food (Hebei) Co., Ltd. 70
Table 56, Cattle Inventory & Milk Production of Fortune Ng Fung Breeding (Yanjiao) Co.,Ltd., 2017 71
Table 57, Profile of Zhongxing Dairy Industry Co., Ltd. 72
Table 58, Cattle Inventory & Milk Production of Zhongxing Dairy Industry Co., Ltd., 2017 72
Table 59, Cattle Inventory & Milk Production of Huaxia (Sanhe) Dairy Farm Co., Ltd., 2017 73
Table 60, Profile of Fonterra Tangshan Dairy Farm Co., Ltd. 74
Table 61, Cattle Inventory & Milk Production of Fonterra Tangshan Dairy Farm Co., Ltd., 2017 74
Table 62, Profile of Jinan Jiabao Milk Co., Ltd. 75
Table 63, Cattle Inventory & Milk Production of Jinan Jiabao Milk Co., Ltd., 2017 75
Attached Table 1, China’s Distribution of Cattle Farms of Different Size by Province, 2017 76
Attached Table 2, China’s Cattle Inventory by Province, 2014-2017 77
Attached Table 3, China’s Milk Production by Province, 2014-2017 78
Attached Table 4, Central Government’s Subsidy for Equipment Procurement & Main Equipment Company in China 79
 

【编辑:中国投资政策网】 TOP
专项定制报告专项定制报告分类
专项报告类别:
商业计划书 | 可行性研究报告 | 资金申请报告
可行性报告 | 项目申请报告 | 英文报告
联系方式
·联系人:
余先生、方小姐
·电话号码:
15989039303
·地址:
广州市番禺区桥南街福德路241号奥园广场塔三1305室

订购流程订购流程
① 签订可行性报告订购合同;
② 通过银行转帐、邮局汇款等形式款项;
③ 中国投资策划网见到汇款底单或者转帐底单后,24小时内发送可行性研究报告电子版,72小时内寄送正式版以及发票。