投资策划网—规模最大、实力最强的研究报告提供商! 关于我们 联系中撰 网站地图
稳评报告
当前位置:主页 > 稳评报告 > >> 2016 Deep Research Report on China Saw Wire Industry
2016 Deep Research Report on China Saw Wire Industry
2016-07-19 09:26共有人浏览
更多
内 容
 

【导读】

 :
2012 Deep Research Report on China Saw Wire Industry
 

【报告目录】

 :

【Abstract】:

<2012 Deep Research Report on China Saw Wire Industry>was professional and depth research report on global and China saw wire industry. this report has firstly introduced saw wire definition classification industry chain etc relation information. Then introduced saw wire manufacturing technology and process and cost structure. And then Summary statistics of Global and China major copper coated and diamond coated saw wire manufacturers 2008-2015 copper and diamond coated saw wire capacity production supply demand (mainly according silicon wafer production and bricks cutting) shortage and copper coated saw wire selling price cost profit profit margin and production value. And also introduced international and China 26 major saw wire companies basic information, 2009-2016 copper or diamond coated saw wire capacity production price cost profit margin and production value etc details information and saw wire equipment or wire rod sources. and also introduced saw wire materials cost, energy cost, Depreciation cost,Labor cost etc saw wire manufacturing cost and cost structure,finally, this report introduced 5000ton/year copper coated saw wire project feasibility analysis and investment return analysis.and also give related research conclusions and development trend analysis of China saw wire industry. In a word, it was a depth research report on Global and China saw wire industry. And thanks to the support and assistance from saw wire industry chain (saw wire companies Solar wafer companies raw materials wire saw or squarer equipment suppliers government related agencies etc) related experts and enterprises during company Team survey and interview.


【Table of Contents】 

Chapter One Saw Wire Industry Overview 1
1.1 Definition of Saw Wire 1
1.2 Classification and Application 3
1.3 Industry Chain Structure 4

Chapter Two Manufacture Technology and Processes of Saw Wire 6
2.1 Copper Coating Saw Wire Manufacturing Process 6
2.2 Diamond Coating Saw Wire Manufacturing Process 7

Chapter Three Global and China Saw Wire Production Supply Sales Demand Market Status and Forecast 2010-2014 7
3.1 Copper Coated Saw Wire Production 7
3.2 Diamond Coated Saw Wire Production 12
3.3 Copper Coated Saw Wire Demand 15
3.4 Diamond Coated Saw Wire Demand 18
3.5 Global and China Saw Wire Supply Demand and Shortage 18
3.6 Copper Coated Saw Wire Cost Price Production Value Profit Margin 19
3.7 Diamond Coated Saw Wire Cost Price Production Value Profit Margin 20

Chapter Four Key Saw Wire Manufacturers 21
4.1 Bekaert Belgium Jiangyin 21
4.2 TOKYO ROPE MFG Japan Changzhou 25
4.3 ArcelorMittal Luxembourg Rongcheng 28
4.4 KISWIRE Korea Shanghai 31
4.5 KTS-China Japan Shanghai 35
4.6 Fandeng Changzhou 38
4.7 Quancheng Sichuan Mianyang 41
4.8 Haofa Jiangsu Taixing 44
4.9 Junma Jiangsu Zhangjiagang 47
4.10 Xingda Jiangsu Xinghua 50
4.11 Weier New Materials Jiangsu Wuxi 53
4.12 Ruiyu Sichuan Meishan 56
4.13 Bangwei Jiangxi Xinyu 59
4.14 Zhenjiang Naisi 62
4.15 Hengxing Science&Technology Henan Gongyi 64
4.16 Fuxing S&T Hubei Buidling Project 66
4.17 SUMITOMO ELECTRIC Malaysia Taiwan Suzhou 68
4.18 Tokusen Kogyo Japan USA 72
4.19 Sayoka Corporation Japan 74
4.20 Japan Fine Steel Japan 78
4.21 Juli New Energy Hebei Baoding (Building Project) 80
4.22 Mande Tianjin Diamond Saw Wire 82
4.23 Diamond Wire (Meyer Burger AG) USA Diamond Saw Wire 86
4.24 WellPresi Dongguan Diamond Saw Wire 93
4.25 Diat Diamond Changsha Diamond Saw Wire 96
4.26 LOG-O-MATIC Germany Diamond Saw Wire 99
4.27 Applied Materials (HCT) Suzhou Diamond Saw Wire (Planing Project) 102

Chapter Five Copper Coating Saw Wire Manufacturing Cost Analysis 103
5.1 Raw Materials Consumption and cost analysis 103
5.2 Energy Consumption and Cost Analysis 104
5.3 Equipments or Fixed Assets Depreciation Cost 105
5.4 Labor Cost 105
5.5 Manufacturing Cost and Cost Structure 106

Chapter Six Feasibility Analysis of China 5000Ton/Year Copper Coated Saw Wire Project 107
6.1 China Copper Coated Saw Wire Project Opportunities and Risks Analysis 107
6.2 Feasibility Analysis of China 5000Ton/Year Copper Coated Saw Wire Project 108

Chapter Seven Saw Wire Research Conclusions 109


【Figures & Tables】

Figure Multi-wire Cutting Process Structure 1
Figure Saw Wire Silicon Wafer Cutting Figure 2
Table Chemical Composition of Saw Wire Raw Materials 2
Table Copper Coated 0.12mm and Diamond Coated 0.14mm Silicon Wafer Cutting Saw Wire Classifications and Applications 3
Table Copper Coated 0.25mm and Diamond Coated 0.35mm Silicon Bricks Cutting Saw Wire Classifications and Applications 3
Figure Saw Wire Industry Chain Structure 4
Figure Copper Coated Saw Wire Cost (USD/Ton) Structure 5
Figure Manufacturing Process of Copper Coated Saw Wire 6
Figure Manufacturing Process of Diamond Coated Saw Wire 7
Table 2009-2016 China Key Manufacturers Copper Coated Saw Wire Capacity and Total Capacity (Million km) List 7
Table 2009-2016 China Key Manufacturers Copper Coated Saw Wire Capacity Market Share List 8
Table 2009-2016 China Key Manufacturers Copper Coated Saw Wire Production and Total Production (Million km) List 9
Table 2009-2016 China Key Manufacturers Copper Coated Saw Wire Production Market Share List 9
Figure 2009-2016 China Copper Coated Saw Wire Capacity Production (Million km) and Growth Rate 10
Table 2009-2016 China Copper Coated Saw Wire Capacity Utilization (%) 10
Table 2009-2016 Global Key Manufacturers Copper Coated Saw Wire Production and Total Production (Million km) List 11
Table 2009-2016 Global Key Manufacturers Copper Coated Saw Wire Production Market Share List 12
Table 2009-2016 Global Key Manufacturers Diamond Coated Saw Wire Capacity and Total Capacity (Million m) List 13
Table 2009-2016 Global Key Manufacturers Diamond Coated Saw Wire Capacity Market Share List 13
Table 2009-2016 Global Key Manufacturers Diamond Coated Saw Wire Production and Total Production (Million m) List 13
Table 2009-2016 Global Key Manufacturers Diamond Coated Saw Wire Production Market Share List 14
Figure 2009-2016 Global Diamond Coated Saw Wire Capacity Production (Million m) and Growth Rate 14
Table 2009-2016 Global Diamond Coated Saw Wire Capacity Utilization (%) 15
Table 2009-2016 China Japan Europe US and Global Solar Wafer Production (GW) 15
Table 2009-2016 China Japan Europe US and Global Solar Wafer Cutting Wire Demand (Million km) 16
Table 2009-2016 Global Semiconductor Wafer Production (Million Square Inches) 16
Table 2009-2016 Global Semiconductor Wafer Cutting Wire Demand (Million km) 17
Table 2009-2016 Global Solar and Semiconductor Wafer Cutting Wire Demand (Million km) and Market Share 17
Table 2009-2016 Global Diamond Coated Saw Wire Demand (Million m) 18
Table 2009-2016 China Copper Coated Saw Wire Supply Demand and Shortage (Million km) 19
Table 2009-2016 Global Copper Coated Saw Wire Supply Demand and Shortage (Million km) 19
Table 2009-2016 Global Diamond Coated Saw Wire Supply Demand and Shortage (Million m) 19
Table 2009-2016 China Saw Wire Production (Million km) Price Cost Profit (USD/km) Production Value (Million USD) and Profit Margin 20
Table 2009-2016 Global Saw Wire Production (Million km) Price Cost Profit (USD/km) Production Value (Million USD) and Profit Margin 20
Table 2009-2016 Global Diamond Coated Saw Wire Production (Million m) Price Cost Profit (USD/m) Production Value (Million USD) and Profit Margin 21
Table Bekaert Company Information List (Products Revenue Raw Materials Equipments Customers Expansion Plan etc 13 Itmes) 21
Table 2009-2016 Bekaert Saw Wire Capacity Production (Million km) Price Cost Profit (USD/km) Production Value (Million USD) and Profit Margin 24
Figure 2009-2016 Bekaert Saw Wire Capacity Production (Million km) and Growth Rate 25
Table TOKYO ROPE MFG Company Information List (Products Revenue Raw Materials Equipments Customers Expansion Plan etc 13 Itmes) 25
Table 2009-2016 TOKYO ROPE MFG Saw Wire Capacity Production (Million km) Price Cost Profit (USD/km) Production Value (Million USD) and Profit Margin 27
Figure 2009-2016 TOKYO ROPE MFG Saw Wire Capacity Production (Million km) and Growth Rate 28
Table ArcelorMittal Company Information List (Products Revenue Raw Materials Equipments Customers Expansion Plan etc 13 Itmes) 29
Table 2009-2016 ArcelorMittal Saw Wire Capacity Production (Million km) Price Cost Profit (USD/km) Production Value (Million USD) and Profit Margin 30
Figure 2009-2016 ArcelorMittal Saw Wire Capacity Production (Million km) and Growth Rate 31
Table KISWIRE Company Information List (Products Revenue Raw Materials Equipments Customers Expansion Plan etc 13 Itmes) 31
Table 2009-2016 KISWIRE Saw Wire Capacity Production (Million km) Price Cost Profit (USD/km) Production Value (Million USD) and Profit Margin 34
Figure 2009-2016 KISWIRE Saw Wire Capacity Production (Million km) and Growth Rate 35
Table KTS-China Company Information List (Products Revenue Raw Materials Equipments Customers Expansion Plan etc 13 Itmes) 36
Table 2009-2016 KTS-China Saw Wire Capacity Production (Million km) Price Cost Profit (USD/km) Production Value (Million USD) and Profit Margin 37
Figure 2009-2016 KTS-China Saw Wire Capacity Production (Million km) and Growth Rate 38
Table Fandeng Company Information List (Products Revenue Raw Materials Equipments Customers Expansion Plan etc 13 Itmes) 38
Table 2009-2016 Fandeng Saw Wire Capacity Production (Million km) Price Cost Profit (USD/km) Production Value (Million USD) and Profit Margin 40
Figure 2009-2016 Fandeng Saw Wire Capacity Production (Million km) and Growth Rate 41
Table Quancheng Company Information List (Products Revenue Raw Materials Equipments Customers Expansion Plan etc 13 Itmes) 41
Table 2009-2016 Quancheng Saw Wire Capacity Production (Million km) Price Cost Profit (USD/km) Production Value (Million USD) and Profit Margin 43
Figure 2009-2016 Quancheng Saw Wire Capacity Production (Million km) and Growth Rate 44
Table Haofa Company Information List (Products Revenue Raw Materials Equipments Customers Expansion Plan etc 13 Itmes) 44
Table 2009-2016 Haofa Saw Wire Capacity Production (Million km) Price Cost Profit (USD/km) Production Value (Million USD) and Profit Margin 46
Figure 2009-2016 Haofa Saw Wire Capacity Production (Million km) and Growth Rate 47
Table Junma Company Information List (Products Revenue Raw Materials Equipments Customers Expansion Plan etc 13 Itmes) 47
Table 2009-2016 Junma Saw Wire Capacity Production (Million km) Price Cost Profit (USD/km) Production Value (Million USD) and Profit Margin 49
Figure 2009-2016 Junma Saw Wire Capacity Production (Million km) and Growth Rate 50
Table Xingda Company Information List (Products Revenue Raw Materials Equipments Customers Expansion Plan etc 13 Itmes) 50
Table 2009-2016 Xingda Saw Wire Capacity Production (Million km) Price Cost Profit (USD/km) Production Value (Million USD) and Profit Margin 52
Figure 2009-2016 Xingda Saw Wire Capacity Production (Million km) and Growth Rate 53
Table Weier New Materials Company Information List (Products Revenue Raw Materials Equipments Customers Expansion Plan etc 13 Itmes) 53
Table 2009-2016 Weier New Materials Saw Wire Capacity Production (Million km) Price Cost Profit (USD/km) Production Value (Million USD) and Profit Margin 55
Figure 2009-2016 Weier New Materials Saw Wire Capacity Production (Million km) and Growth Rate 56
Table Ruiyu Company Information List (Products Revenue Raw Materials Equipments Customers Expansion Plan etc 13 Itmes) 56
Table 2009-2016 Ruiyu Saw Wire Capacity Production (Million km) Price Cost Profit (USD/km) Production Value (Million USD) and Profit Margin 58
Figure 2009-2016 Ruiyu Saw Wire Capacity Production (Million km) and Growth Rate 59
Table Bangwei Company Information List (Products Revenue Raw Materials Equipments Customers Expansion Plan etc 13 Itmes) 59
Table 2009-2016 Bangwei Saw Wire Capacity Production (Million km) Price Cost Profit (USD/km) Production Value (Million USD) and Profit Margin 60
Figure 2009-2016 Bangwei Saw Wire Capacity Production (Million km) and Growth Rate 61
Table 2009-2016 Zhenjiang Naisi Saw Wire Capacity Production (Million km) Price Cost Profit (USD/km) Production Value (Million USD) and Profit Margin 63
Figure 2009-2016 Zhenjiang Naisi Saw Wire Capacity Production (Million km) and Growth Rate 64
Table Hengxing Science&Technology Company Information List (Products Revenue Raw Materials Equipments Customers Expansion Plan etc 13 Itmes) 64
Table 2009-2016 Hengxing Science&Technology Saw Wire Capacity Production (Million km) Price Cost Profit (USD/km) Production Value (Million USD) and Profit Margin 65
Figure 2009-2016 Hengxing Science&Technology Saw Wire Capacity Production (Million km) and Growth Rate 66
Table 2009-2016 Fuxing S&T Saw Wire Capacity Production (Million km) Price Cost Profit (USD/km) Production Value (Million USD) and Profit Margin 67
Figure 2009-2016 Fuxing S&T Saw Wire Capacity Production (Million km) and Growth Rate 68
Table 2009-2016 SUMITOMO ELECTRIC Saw Wire Capacity Production (Million km) Price Cost Profit (USD/km) Production Value (Million USD) and Profit Margin 70
Figure 2009-2016 SUMITOMO ELECTRIC Saw Wire Capacity Production (Million km) and Growth Rate 71
Table 2009-2016 Tokusen Kogyo Saw Wire Capacity Production (Million km) Price Cost Profit (USD/km) Production Value (Million USD) and Profit Margin 73
Figure 2009-2016 Tokusen Kogyo Saw Wire Capacity Production (Million km) and Growth Rate 74
Table 2009-2016 Sayoka Saw Wire Capacity Production (Million km) Price Cost Profit (USD/km) Production Value (Million USD) and Profit Margin 76
Figure 2009-2016 Sayoka Saw Wire Capacity Production (Million km) and Growth Rate 77
Table 2009-2016 Japan Fine Steel Saw Wire Capacity Production (Million km) Price Cost Profit (USD/km) Production Value (Million USD) and Profit Margin 79
Figure 2009-2016 Japan Fine Steel Saw Wire Capacity Production (Million km) and Growth Rate 80
Table 2009-2016 Juli New Energy Saw Wire Capacity Production (Million km) Price Cost Profit (USD/km) Production Value (Million USD) and Profit Margin 80
Figure 2009-2016 Juli New Energy Saw Wire Capacity Production (Million km) and Growth Rate 81
Table Mande Company Information List (Products Revenue Raw Materials Equipments Customers Expansion Plan etc 13 Itmes) 82
Table 0.34mm Diamond Bricking Wire and 0.25mm Copper Coating Bricking Wire Application Specifications on HCT Evolution Machine 84
Table 2009-2016 Mande Diamond Saw Wire Capacity Production (Million m) Price Cost Profit (USD/m) Production Value (Million USD) and Profit Margin 85
Figure 2009-2016 Mande Diamond Saw Wire Capacity Production (Million m) and Growth Rate 85
Table Diamond Wire Company Information List (Products Revenue Raw Materials Equipments Customers Expansion Plan etc 13 Itmes) 86
Table 2009-2016 Diamond Wire Diamond Saw Wire Capacity Production (Million m) Price Cost Profit (USD/m) Production Value (Million USD) and Profit Margin 88
Table 0.14mm Diamond Saw Wire and 0.12mm Copper Coating Saw Wire Silicon Wafer Cutting Specifications Comparison(MB DS264 Wire Saw) 91
Table 0.35mm Diamond Bricking Wire and 0.25mm Copper Coating Bricking Wire Application Specifications on MB Evolution Machine 92
Figure 2009-2016 Diamond Wire Diamond Saw Wire Capacity Production (Million m) and Growth Rate 93
Table WellPresi Company Information List (Products Revenue Raw Materials Equipments Customers Expansion Plan etc 13 Itmes) 93
Table 2009-2016 WellPresi Diamond Saw Wire Capacity Production (Million m) Price Cost Profit (USD/m) Production Value (Million USD) and Profit Margin 95
Figure 2009-2016 WellPresi Diamond Saw Wire Capacity Production (Million m) and Growth Rate 96
Table Diat Diamond Company Information List (Products Revenue Raw Materials Equipments Customers Expansion Plan etc 13 Itmes) 96
Table 2009-2016 Diat Diamond Diamond Saw Wire Capacity Production (Million m) Price Cost Profit (USD/m) Production Value (Million USD) and Profit Margin 98
Figure 2009-2016 Diat Diamond Diamond Saw Wire Capacity Production (Million m) and Growth Rate 99
Table LOG-O-MATIC Company Information List (Products Revenue Raw Materials Equipments Customers Expansion Plan etc 13 Itmes) 99
Table 2009-2016 LOG-O-MATIC Diamond Saw Wire Capacity Production (Million m) Price Cost Profit (USD/m) Production Value (Million USD) and Profit Margin 101
Figure 2009-2016 LOG-O-MATIC Diamond Saw Wire Capacity Production (Million m) and Growth Rate 101
Figure Applied Materials(HCT) Diamond Squarer System 102
Table 2009-2016 Copper Coating Saw Wire Wire Rod and Copper etc Cost (USD/Ton) List 103
Figure 2010 Global Copper Coated Saw Wire Raw Materials Wire Rod Supply Regional Market Share 104
Table 2009-2016 Copper Coating Saw Wire Energy Cost (USD/Ton) List 104
Table 2009-2016 Copper Coating Saw Wire Equipments or Fixed Assets Depreciation Cost (USD/Ton) List 105
Table 2009-2016 Copper Coating Saw Wire Labor Cost (USD/Ton) List 105
Table 2009-2016 Copper Coating Saw Wire Energy Depreciation Labor Wire Rod Copper etc Cost and Total Manufacturing Cost (USD/Ton) 106
Table 2009-2016 Copper Coating Saw Wire Energy Depreciation Labor Wire Rod Copper etc Cost Market Share 107
Table China Copper Coated Saw Wire Project Opportunities and Risks List 107
Table Feasibility Analysis of China 5000Ton/Year Copper Coated Saw Wire Project 108



【编辑:中国投资政策网】 TOP
专项定制报告专项定制报告分类
专项报告类别:
商业计划书 | 可行性研究报告 | 资金申请报告
可行性报告 | 项目申请报告 | 英文报告
联系方式
·联系人:
余先生、方小姐
·电话号码:
15989039303
·地址:
广州市番禺区桥南街福德路241号奥园广场塔三1305室

订购流程订购流程
① 签订可行性报告订购合同;
② 通过银行转帐、邮局汇款等形式款项;
③ 中国投资策划网见到汇款底单或者转帐底单后,24小时内发送可行性研究报告电子版,72小时内寄送正式版以及发票。