投资策划网—规模最大、实力最强的研究报告提供商! 关于我们 联系中撰 网站地图
稳评报告
当前位置:主页 > 稳评报告 > >> Analysis and Forecast Report of Small Packaged Vegoil Indust
Analysis and Forecast Report of Small Packaged Vegoil Indust
2015-10-20 10:05共有人浏览
更多
内 容
 

【导读】

 :
Analysis and Forecast Report of Small Packaged Vegoil Industry in China
 

【报告目录】

 :

【Report Name】:Analysis and Forecast Report of Small Packaged Vegoil Industry in China
【Published】:Jan/2013
【Report Code】:SN
【Form】: PDF or Hard copy  
【Delivery】: E-mail or EMS
【Report Price】:PDF Copy: 3300USD
 
Research Background
In the early 1990s, small packaged edible vegetable oil (hereinafter referred to as vegoil) entered the Chinese market. In 2011, China’s vegoil consumption reached 27.77 million MT, among which small packaged vegoil covered 22% or 6.16 million MT.

In the process of rapid development of small packaged vegoil industry, the incomplete national standard and low technology requirement led to the high homogenization and intense market competition accompanied by the decreasing profits and even vicious competition.

Based on our years of tracking analysis and study, this report is expected to help you get further and in-depth understanding of the current situation and future direction of the small packaged vegoil industry in China and find valuable investment opportunities.


TABLE OF CONTENTS

Part One: Overview of China’s Small Packaged Vegoil Industry 
1 Basic Situation of Small Packaged Vegoil
1.1 Main Categories of Small Packaged Vegoil
1.2 Packing Sizes of Small Packaged Vegoil
1.2.1 Packing Characteristics of Small Packaged Vegoil 
1.2.2 Main Packing Sizes of Small Packaged Vegoil
1.2.3 Packing Sizes for Household Consumption
1.3 Quality Standard of Small Packaged Vegoil 
2 Characteristics of Small Packaged Vegoil Industry Development in China 
2.1 Rapid Development of Small Packaged Vegoil Industry 
2.1.1 Leading Annual Growth Rate in Vegoil Industry
2.1.2 Huge Demand from Large & Medium-Sized Cities Drives Rapid Industry Development 
2.2 High Concentration in Small Packaged Vegoil Industry 
2.2.1 Market Access Rules Wash Out a Large Number of Backward Production Capacities 
2.2.2 Small Packaged Vegoil Consumption Concentrates in Big Brands

Part Two: Analysis and Forecast on Small Packaged Vegoil Production in China 
3 Current Situation of China’s Small Packaged Vegoil Industry 
3.1 Variation in Small Packaged Vegoil Production in China 
3.2 Development Stages of Small Packaged Vegoil Production
3.3 Brand Competition in Small Packaged Vegoil Market
3.4 Problems in Small Packaged Vegoil Development 
4 Forecast on Small Packaged Vegoil Production in China

Part Three: Analysis and Forecast on Small Packaged Vegoil Consumption in China
5 Changes of Small Packaged Vegoil Consumption 
5.1 Changes of National Small Packaged Vegoil Consumption Volume 
5.2 Categories Consumption Structure of Small Packaged Vegoil 
6 Characteristics of Small Packaged Vegoil Consumption in Different Regions 
6.1 Small Packaged Vegoil Consumption Ratio in Different Regions 
6.2 Major Small Packaged Vegoil Consumption Categories in Different Regions 
6.3 Major Brands of Small Packaged Vegoil Consumption in Different Regions 
7 Forecast on Small Packaged Vegoil Demand in China
7.1 Market Demand and Ratio to Keep Increasing
7.2 Forecast on China’s Small Packaged Vegoil Consumption Volume by 2020 
7.3 Characteristics of Small Packaged Vegoil in Future
7.3.1 Market Demand to Be Diversified 
7.3.2 High-End Vegoil to Be an Important Competitive Field 
7.3.3 Urban and Rural Market as New Demand Growth Point

Part Four: Sales Situation of Small Packaged Vegoil in China 
8 Sales Channels and Marketing Strategies of Small Packaged Vegoil in China 
8.1 Main Participants in Sales Channels 
8.1.1 Production Enterprises 
8.1.2 Dealers 
8.1.3 Distributors and Wholesalers
8.1.4 Terminal Retailers 
8.2 Main Terminal Retail Channels
8.2.1 Large Supermarket Channels
8.2.2 Traditional Retail Channels
8.2.3 Group Purchase 
8.2.4 Online Sales Channels 
8.3 Development Trend of Sales Channels
8.2.1 Sales Chain will be Shortened and Widened 
8.2.2 E-commerce
8.2.3 Changes of Welfare Group Purchase Channel

Part Five: Key Producers of Small Packaged Vegoil and Their Market Shares in China 
9 Key Producers of Small Packaged Vegoil in China 
9.1 High Concentration in Small Packaged Vegoil Production 
9.2 Analysis of Top 15 Small Packaged Vegoil Producers
9.2.1 Yihai Kerry Group
9.2.2 COFCO
9.2.3 Luhua Group
9.2.4 Sanhe Hopefull Grain & Oil Group Co., Ltd
9.2.5 Tianjin Julong Group
9.2.6 Jiusan Grain & Oil Industry Group Co., Ltd
9.2.7 Chongqing Hongqingting Oil Co., Ltd
9.2.8 Beijing Grain Group Co., Ltd
9.2.9 Sinograin Oil Co., Ltd
9.2.10 Shanghai Liangyou Haishi Oils & Fats Industry Co., Ltd
9.2.11 Xiwang Food Co., Ltd
9.2.12 Guangdong Eagle Brand Food Co., Ltd
9.2.13 Shenzhen Lam Soon Oil Co., Ltd
9.2.14 Changshouhua Food Co., Ltd
9.2.15 Hubei Aoxing Grain & Oil Industry Co., Ltd

TABLE CONTENTS
Table1, Production Situation of Major Small Packaged Vegoil Enterprises
Table2, Production Situation of Affiliated Vegoil Enterprises of Yihai Kerry Group
Table3, Basic Situation of Main Small Packaged Vegoil Brands of Yihai Kerry Group
Table4, Production Situation of Affiliated Vegoil Enterprises of COFCO
Table5, Basic Situation of Main Small Packaged Vegoil Brands of COFCO
Table6, Production Situation of Affiliated Vegoil Enterprises of Luhua Group
Table7, Production Situation of Affiliated Vegoil Enterprises of Chongqing Hongqingting Oil Co., Ltd
Table8, Basic Situation of Main Small Packaged Vegoil Brands of Shanghai Liangyou Haishi Oils & Fats Industry Co., Ltd
Table9, Basic Situation of Main Small Packaged Vegoil Brands of Guangdong Eagle Brand Food Co., Ltd
Table10, Basic Situation of Main Small Packaged Vegoil Brands of Shenzhen Lam Soon Oil Co., Ltd

FIGURE CONTENTS
Fig1, Annual Growth Rate of China’s Vegoil and Small Packaged Vegoil Consumption, 2000-2012
Fig2, Variation in China’s Vegoil and Small Packaged Vegoil Production, 2000-2012
Fig3, Variation in China’s Vegoil and Small Packaged Vegoil Consumption, 2000-2012
Fig4, Categories Structure of Main Small Packaged Vegoil in China
Fig5, Comparison of Small Packaged Vegoil Consumption in Different Regions 
Fig6, Categories Structure of Small Packaged Vegoil Consumption in China’s Northeast 
Fig7, Categories Structure of Small Packaged Vegoil Consumption in North China 
Fig8, Categories Structure of Small Packaged Vegoil Consumption in East China
Fig9, Categories Structure of Small Packaged Vegoil Consumption in Central China
Fig10, Categories Structure of Small Packaged Vegoil Consumption in South China 
Fig11, Categories Structure of Small Packaged Vegoil Consumption in China’s Northwest 
Fig12, Categories Structure of Small Packaged Vegoil Consumption in China’s Southwest
Fig13, Hierarchy Structure of Small Packaged Vegoil Sales Channels
Fig14, High Concentration in Small Packaged Vegoil Producing Capacity
Fig15, Major Vegoil Brands of Yihai Kerry Group
Fig16, Marketing Management System of Small Packaged Vegoil of Yihai Kerry Group

Map1, Distribution of Small Packaged Vegoil Producing Enterprises 
Map2, Distribution of Affiliated Vegoil Enterprises of Yihai Kerry Group 
Map3, Distribution of Affiliated Vegoil Enterprises of COFCO
Map4, Distribution of Affiliated Vegoil Enterprises of Luhua Group



【编辑:中国投资政策网】 TOP
专项定制报告专项定制报告分类
专项报告类别:
商业计划书 | 可行性研究报告 | 资金申请报告
可行性报告 | 项目申请报告 | 英文报告
联系方式
·联系人:
余先生、方小姐
·电话号码:
15989039303
·地址:
广州市番禺区桥南街福德路241号奥园广场塔三1305室

订购流程订购流程
① 签订可行性报告订购合同;
② 通过银行转帐、邮局汇款等形式款项;
③ 中国投资策划网见到汇款底单或者转帐底单后,24小时内发送可行性研究报告电子版,72小时内寄送正式版以及发票。