投资策划网—规模最大、实力最强的研究报告提供商! 关于我们 联系中撰 网站地图
稳评报告
当前位置:主页 > 稳评报告 > >> Deep Research Report on China Power Cable Industry 2012-2016
Deep Research Report on China Power Cable Industry 2012-2016
2012-08-15 09:59共有人浏览
更多
内 容
 
Chapter One Power Cable Industry Overview
1.1 Power Cable Material Definition
1.2 Power Cable Structure
1.3 Power Cable Material Classification and Application
1.4 Related Terms
1.5.Basic knowledge of wire and cable
1.6 Industry policies and regulations
1.7 Industry Chain Structure
1.8 The global industrial pattern and technology trends
1.9 Domestic industry overview and development trend
Chapter Two Power Cable Production Technology and Cost Analysis
2.1 Process Analysis
2.2 Production flow 
2.3 The cost structure analysis
2.4 The main production equipment
2.5 Technology trends
Chapter Three Power Cable Production, Supply, Sales, Demand Market Status and Forecast Analysis
3.1 Power cable production and supply overview
3.2 Power cable demand overview
3.3 Power cable supply and demand 
3.4 List of power cable average cost, price, output value, profit margin
3.5 Power cable imports and exports statistics
Chapter Four China power cable core enterprise research
4.1 FAR EAST HOLDING GROUP CO.,LTD 
4.2 Wuxi and Shanghai Electric Wire & Cable Co.,Ltd
4.3 Tianjin Suli Wire & Cable Co.,Ltd
4.4 BAOSHENG GROUP CO.,LTD(Stock Code:600973)
4.5 ZHEJIANG CHENGUANG CABLE CO.,LTD
4.6 Hebei NewBaoFeng Wire & Cable Co.,Ltd
4.7 Walsin Lihwa Co.,Ltd
4.8 Nexans Group Co.,Ltd(China) 
4.9 Zhejiang Wanma Cable Co.,Ltd(Stock Code:002276) 
4.10 AnHui JiangHuai Cable Group Co.,Ltd
4.11 Hengtong Group Co.,Ltd 
4.12 Wuxi Jiangnan Cable Co.,Ltd(Stock Code:01366) 
4.13 Huayang Wire & Cable Group Co.,Ltd 
4.14 Yangzhou Shuguang Cable Co.,Ltd 
4.15 Jiangsu New Yuancheng Cable Co., Ltd
4.16 Jiangsu ShangShang Cable Group Co., Ltd 
4.17 Ningbo ORIENT Cable Co., Ltd 
4.19 TEBA  Cable Co., Ltd(Stock Code:600089) 
4.19 China Nanyang Cable Group Co., Ltd(Stock Code:002212) 
4.20 Jiangsu Zhongchao Cable Co., Ltd(Stock Code:002471) 
4.21 Guangdong Lingnan Cable Co., Ltd
4.22 GUANGDONG SHINE CABLES CO.,LTD
4.23 QINGDAO HANHE CABLE CO.,LTD(Stock Code:002498) 
4.24 Prysmian Group Co., Ltd(China)
4.25 Goldcup Electric Apparatus Co., Ltd(Stock Code:002533) 
4.26 Sichuan Star Cable Co., Ltd(Stock code:603333) 
4.27 CHINA WANDA GROUP CO.,LTD 
4.28 FUJIAN NAN PING SUN CABLE CO.,LTD(Stock Code:002300) 
4.29 SHANDONG QIXING GROUP CO.,LTD
4.30 Shanghai Morn Electric Equipment Co., Ltd(Stock Code:002451) 
4.31 Shenyang Guhe Cable Co., Ltd 
4.32 Shanghai Fujikura Co., Ltd
Chapter Five 500kv EHV XLPE Power Cable Project Investment Feasibility Analysis
5.1 500kv EHV XLPE Power Cable project competitive environment analysis
5.2 500kv EHV XLPE Power Cable project opportunity and risk analysis
5.3 500kv EHV XLPE Power Cable project feasibility analysis
5.3.1  Project Name
5.3.2  Project proposed scale
5.3.3  Project Products
5.3.4  Project construction content
5.3.5  Project Schedule
5.3.6  Project Investment content
5.3.7  Project implementation progress
5.3.8  List of equipment and materials of 500kv EHV XLPE Power Cable project
Chapter Six Power Cable Industry Conclusion
 
【Figures & Tables】
Figure Power cable product
Figure Power cable applications
Figure An application example of the power cable in urban underground grid
Figure Power cable Structure
Figure Three-core XLPE insulated steel tape armored power cable
Figure The structure of the undersea high-voltage power cables
Table The general classification, concepts and characteristics of power cable
Table Global common classification and application of power cable
Table Power cable model
Table Detailed description of power cable model 
Table Wire and cable product model
Table Wire and cable classification, characteristics and applications
Figure Power cable industry chain structure
Figure Upstream and downstream industry chain in the power cable
Figure Market share of the global cable industry
Figure Year 2007 global high-voltage, extra high voltage power cable application
Figure The global cable industry market concentration contrast
Table List of Year 2006-2010 Chinese wire and cable industry sales income
Figure Wire and cable sales revenue share of GDP
Figure Wire and cable sales revenue and growth trends
Figure Ownership constituent ratio of Chinese wire and cable manufacturers
Figure The basic process flow of power cable
Figure Low voltage power cable products process (below 1KV)
Figure Medium voltage power cable products process(6kv-35kv)
Figure High voltage power cable products process(110kv-220kv)
Figure EHV power cable products process(500kv)
Figure Cross-linked cable process
Figure Power cable cost structure 
Table List of major equipment of the power cable
Figure The main production equipment of the power cable
Figure Power cable testing equipment
Table List of Year 2009-2013 Chinese 32 enterprises power cable capacity and total capacity
Table List of Year 2009-2013 Chinese 32 enterprises power cable capacity market share
Table List of Year 2009-2013 Chinese 32 enterprises power cable output and total output
Table List of Year 2009-2013 Chinese 32 enterprises power cable output market share
Table List of Year 2009-2013 Chinese power cable capacity utilization
Figure List of Year 2009-2013 Chinese power cable capacity, output and growth rate
Figure 2011 Chinese power cable enterprise production output (km) top11 market share
Table 2011 January to December, Chinese power cable production (km) sub-provinces and cities statistics
Figure Power cable production in 2011 China(km) in the provinces and cities top6 market share
Table 2010 January to December, Chinese power cable production (km) sub-provinces and cities statistics
Figure Power cable production in 2010 China(km) in the provinces and cities top6 market share
Table 2009 January to December, Chinese power cable production (km) sub-provinces and cities statistics
Figure Power cable production in 2009 China(km) in the provinces and cities top6 market share
Table Year 2000-2012 China power cable production data (km)
Table List of China power cable manufacturers with has high-voltage stand Towers (vcv, production line) and quantity
Table List of China power cable manufacturers with 110kv and above the ccv production line and quantity
Table List of Chinese high-voltage power cables demand and supply 
Table List of January-November 2011 Chinese power industry statistics
Table List of 2010 Chinese power industry statistics
Table List of Year 2009-2013 China power cable production,demand, supply and demand gap (km)
Table List of Year 2009-2013 China High voltage power cables (including 110kv and above) production, demand, supply and demand gap (km)
Figure Market share of the power cable in the wire and cable industry
Figure Power cable with the proportion of copper consumption in the whole wire and cable industry
Figure 2009-2011 Chinese copper price trend
Table List of Year 2009-2013 Chinese power cable production (km), price, cost, profit (10K RMB / km) output value (million)and profit margins
Table List of Year 2009-2013 China power cable domestic production, export ,imports, domestic sales (km)
Table List of Year 2009-2011 China power cable imports, exports and money amount
Table List of FAR EAST corporate information (products, applications, technology, research and development, production capacity, contact information, etc)
Table List of Year 2009-2013 FAR EAST 1kv-35kv,110kv,220kv power cable capacity, output(km),price, cost, profit(10K yuan/km),output value(10K yuan)and profit margin
Table List of Year 2009-2013 FAR EAST 1kv-35kv,110kv,220kv power cable capacity , output(km) and growth rate
Table List of Wuxi and Shanghai Electric corporate information (products, applications, technology, research and development, production capacity, contact information, etc)
Table List of Year 2009-2013 Wuxi and Shanghai Electric 1kv-35kv power cable capacity, output(km),price, cost, profit(10K yuan/km),output value(10K yuan)and profit margin
Table List of Year 2009-2013 Wuxi and Shanghai Electric power cable 1kv-35kv capacity , output(km) and growth rate
Table List of Tianjin Suli corporate information (products, applications, technology, research and development, production capacity, contact information, etc)
Figure Tianjin Suli power cable production workshop
Table List of Year 2009-2013 Tianjin Suli 1kv-35kv,110kv,220kv power cable capacity, output(km),price, cost, profit(10K yuan/km),output value(10K yuan)and profit margin
Table List of Year 2009-2013 Tianjin Suli 1kv-35kv,110kv,220kv power cable capacity , output(km) and growth rate
Table List of BAOSHENG corporate information (products, applications, technology, research and development, production capacity, contact information, etc)
Table List of Year 2009-2013 BAOSHENG 1kv-35kv,110kv power cable capacity, output(km),price, cost, profit(10K yuan/km),output value(10K yuan)and profit margin
Table List of Year 2009-2013 BAOSHENG 1kv-35kv,110kv power cable capacity , output(km) and growth rate
Table List of CHENGUANG corporate information (products, applications, technology, research and development, production capacity, contact information, etc)
Table List of Year 2009-2013 CHENGUANG 1kv-35kv,110kv,220kv power cable capacity, output(km),price, cost, profit(10K yuan/km),output value(10K yuan)and profit margin
Table List of Year 2009-2013 CHENGUANG power cable 1kv-35kv,110kv,220kv capacity , output(km) and growth rate
Table List of NewBaoFeng corporate information (products, applications, technology, research and development, production capacity, contact information, etc)
Figure NewBaoFeng High-voltage power cables stand tower production line
Figure NewBaoFeng sales
Table List of Year 2009-2013 NewBaoFeng 1kv-35kv,110kv,220kv,500kv power cable capacity, output(km),price, cost, profit(10K yuan/km),output value(10K yuan)and profit margin
Table List of Year 2009-2013 NewBaoFeng power cable 1kv-35kv,110kv,220kv,500kv capacity , output(km) and growth rate
Table List of Walsin Lihwa corporate information (products, applications, technology, research and development, production capacity, contact information, etc)
Table List of Year 2009-2013 Walsin Lihwa 1kv-35kv,110kv,220kv,500kv power cable capacity, output(km),price, cost, profit(10K yuan/km),output value(10K yuan)and profit margin
Table List of Year 2009-2013 Walsin Lihwa power cable1kv-35kv,110kv,220kv,500kv  capacity , output(km) and growth rate
Table List of Nexans corporate information (products, applications, technology, research and development, production capacity, contact information, etc)
Figure Nexans  Distribution chart of the production base in China
Table List of Year 2009-2013 Nexans 1kv-35kv,110kv,220kv power cable capacity, output(km),price, cost, profit(10K yuan/km),output value(10K yuan)and profit margin
Table List of Year 2009-2013 Nexans power cable1kv-35kv,110kv,220kv capacity , output(km) and growth rate
Table List of Wanma corporate information (products, applications, technology, research and development, production capacity, contact information, etc)
Table List of Year 2009-2013 Wanma 1kv-35kv,110kv,220kvpower cable capacity, output(km),price, cost, profit(10K yuan/km),output value(10K yuan)and profit margin
Table List of Year 2009-2013 Wanma power cable1kv-35kv,110kv,220kv capacity , output(km) and growth rate
Table List of AnHui JiangHuai corporate information (products, applications, technology, research and development, production capacity, contact information, etc)
Table List of Year 2009-2013 AnHui JiangHuai 1kv-35kv power cable capacity, output(km),price, cost, profit(10K yuan/km),output value(10K yuan)and profit margin
Table List of Year 2009-2013 AnHui JiangHuai power cable1kv-35kv capacity , output(km) and growth rate
Table List of Hengtong corporate information (products, applications, technology, research and development, production capacity, contact information, etc)
Table List of Year 2009-2013 Hengtong 1kv-35kv power cable capacity, output(km),price, cost, profit(10K yuan/km),output value(10K yuan)and profit margin
Table List of Year 2009-2013 Hengtong power cable1kv-35kv capacity , output(km) and growth rate
Table List of Jiangnan corporate information (products, applications, technology, research and development, production capacity, contact information, etc)
Table List of Year 2009-2013 Jiangnan 1kv-35kv,110kv,220kv power cable capacity, output(km),price, cost, profit(10K yuan/km),output value(10K yuan)and profit margin
Table List of Year 2009-2013 Jiangnan power cable1kv-35kv,110kv,220kv capacity , output(km) and growth rate
Table List of Huayang corporate information (products, applications, technology, research and development, production capacity, contact information, etc)
Table List of Year 2009-2013 Huayang 1kv-35kv power cable capacity, output(km),price, cost, profit(10K yuan/km),output value(10K yuan)and profit margin
Table List of Year 2009-2013 Huayang power cable1kv-35kv capacity , output(km) and growth rate
Table List of Shuguang corporate information (products, applications, technology, research and development, production capacity, contact information, etc)
Figure Shuguang High-voltage power cables stand tower production line
Table List of Year 2009-2013 Shuguang 1kv-35kv,110kv,220kv power cable capacity, output(km),price, cost, profit(10K yuan/km),output value(10K yuan)and profit margin
Table List of Year 2009-2013 Shuguang power cable1kv-35kv,110kv,220kv  capacity , output(km) and growth rate
Table List of New Yuancheng corporate information (products, applications, technology, research and development, production capacity, contact information, etc)
Table List of Year 2009-2013 New Yuancheng 1kv-35kv power cable capacity, output(km),price, cost, profit(10K yuan/km),output value(10K yuan)and profit margin
Table List of Year 2009-2013 New Yuancheng power cable1kv-35kv capacity , output(km) and growth rate
Table List of ShangShang corporate information (products, applications, technology, research and development, production capacity, contact information, etc)
Figure Jiangsu ShangShang 110kv power cable product
Figure Jiangsu ShangShang 220kv power cable product
Figure Jiangsu ShangShang 110kv and 220kv power cable produc physical contrast
Table List of Year 2009-2013 ShangShang 1kv-35kv,110kv,220kv,500kv power cable capacity, output(km),price, cost, profit(10K yuan/km),output value(10K yuan)and profit margin
Table List of Year 2009-2013 ShangShang power cable1kv-35kv,110kv,220kv ,500kv capacity , output(km) and growth rate
Table List of ORIENT corporate information (products, applications, technology, research and development, production capacity, contact information, etc)
Figure ORIENT 1kv-35kv,110kv,220kv,500kv power cable product
Table List of Year 2009-2013 ORIENT 1kv-35kv,110kv,220kv,500kv power cable capacity, output(km),price, cost, profit(10K yuan/km),output value(10K yuan)and profit margin
Table List of Year 2009-2013 ORIENT power cable1kv-35kv,110kv,220kv ,500kv capacity , output(km) and growth rate
Table List of TEBA corporate information (products, applications, technology, research and development, production capacity, contact information, etc)
Table List of Year 2009-2013 TEBA 1kv-35kv,110kv,220kv,500kv power cable capacity, output(km),price, cost, profit(10K yuan/km),output value(10K yuan)and profit margin
Table List of Year 2009-2013 TEBA power cable1kv-35kv,110kv,220kv ,500kv capacity , output(km) and growth rate
Table List of China Nanyang corporate information (products, applications, technology, research and development, production capacity, contact information, etc)
Table List of Year 2009-2013 China Nanyang 1kv-35kv,110kv,220kv power cable capacity, output(km),price, cost, profit(10K yuan/km),output value(10K yuan)and profit margin
Table List of Year 2009-2013 China Nanyang power cable1kv-35kv,110kv,220kv capacity , output(km) and growth rate
Table List of Jiangsu Zhongchao corporate information (products, applications, technology, research and development, production capacity, contact information, etc)
Table List of Year 2009-2013 Jiangsu Zhongchao 1kv-35kv power cable capacity, output(km),price, cost, profit(10K yuan/km),output value(10K yuan)and profit margin
Table List of Year 2009-2013 Jiangsu Zhongchao power cable 1kv-35kv capacity , output(km) and growth rate
Table List of Guangdong Lingnan corporate information (products, applications, technology, research and development, production capacity, contact information, etc)
Table List of Year 2009-2013 Guangdong Lingnan 1kv-35kv,110kv,220kv power cable capacity, output(km),price, cost, profit(10K yuan/km),output value(10K yuan)and profit margin
Table List of Year 2009-2013 Guangdong Lingnan power cable1kv-35kv,110kv,220kv  capacity , output(km) and growth rate
Table List of SHINE corporate information (products, applications, technology, research and development, production capacity, contact information, etc)
Table List of Year 2009-2013 SHINE  1kv-35kv power cable capacity, output(km),price, cost, profit(10K yuan/km),output value(10K yuan)and profit margin
Table List of Year 2009-2013 SHINE power cable1kv-35kv capacity , output(km) and growth rate
Table List of HANHE corporate information (products, applications, technology, research and development, production capacity, contact information, etc)
Table List of Year 2009-2013 HANHE 1kv-35kv,110kv,220kv power cable capacity, output(km),price, cost, profit(10K yuan/km),output value(10K yuan)and profit margin
Table List of Year 2009-2013 HANHE power cable1kv-35kv,110kv,220kv  capacity , output(km) and growth rate
Table List of Prysmian corporate information (products, applications, technology, research and development, production capacity, contact information, etc)
Figure  Prysmian (China) distribution chart of production base in China
Table List of Year 2009-2013 Prysmian 1kv-35kv,110kv,220kv,500kv power cable capacity, output(km),price, cost, profit(10K yuan/km),output value(10K yuan)and profit margin
Table List of Year 2009-2013 Prysmian power cable1kv-35kv,110kv,220kv ,500kv capacity , output(km) and growth rate
Table List of Goldcup corporate information (products, applications, technology, research and development, production capacity, contact information, etc)
Table List of Year 2009-2013 Goldcup 1kv-35kv power cable capacity, output(km),price, cost, profit(10K yuan/km),output value(10K yuan)and profit margin
Table List of Year 2009-2013 Goldcup power cable1kv-35kv capacity , output(km) and growth rate
Table List of Sichuan Star corporate information (products, applications, technology, research and development, production capacity, contact information, etc)
Table List of Year 2009-2013 Sichuan Star 1kv-35kv power cable capacity, output(km),price, cost, profit(10K yuan/km),output value(10K yuan)and profit margin
Table List of Year 2009-2013 Sichuan Star power cable1kv-35kv capacity , output(km) and growth rate
Table List of CHINA WANDA corporate information (products, applications, technology, research and development, production capacity, contact information, etc)
Table List of Year 2009-2013 CHINA WANDA 1kv-35kv,110kv power cable capacity, output(km),price, cost, profit(10K yuan/km),output value(10K yuan)and profit margin
Table  List of Year 2009-2013 CHINA WANDA power cable 1kv-35kv,110kv capacity , output(km) and growth rate
Table List of NAN PING SUN corporate information (products, applications, technology, research and development, production capacity, contact information, etc)
Table List of Year 2009-2013 NAN PING SUN 1kv-35kv,110kv,220kv power cable capacity, output(km),price, cost, profit(10K yuan/km),output value(10K yuan)and profit margin
Table List of Year 2009-2013 NAN PING SUN power cable1kv-35kv,110kv,220kv ,500kv capacity , output(km) and growth rate
Table List of QIXING corporate information (products, applications, technology, research and development, production capacity, contact information, etc)
Table List of Year 2009-2013 QIXING 1kv-35kv power cable capacity, output(km),price, cost, profit(10K yuan/km),output value(10K yuan)and profit margin
Table List of Year 2009-2013 QIXING power cable 1kv-35kv capacity , output(km) and growth rate
Table List of Morn corporate information (products, applications, technology, research and development, production capacity, contact information, etc)
Table List of Year 2009-2013 Morn 1kv-35kv power cable capacity, output(km),price, cost, profit(10K yuan/km),output value(10K yuan)and profit margin
Table List of Year 2009-2013 Morn power cable 1kv-35kv capacity , output(km) and growth rate
Table List of Guhe corporate information (products, applications, technology, research and development, production capacity, contact information, etc)
Figure  Guhe cable sales model 
Table List of Year 2009-2013 Guhe 1kv-35kv,110kv,220kv,500kv power cable capacity, output(km),price, cost, profit(10K yuan/km),output value(10K yuan)and profit margin
Table List of Year 2009-2013 Guhe power cable 1kv-35kv,110kv,220kv ,500kv capacity , output(km) and growth rate
Table List of Fujikura corporate information (products, applications, technology, research and development, production capacity, contact information, etc)
Figure Fujikura power cable product
Figure Fujikura power cable product
Table List of Year 2009-2013 Fujikura 1kv-35kv,110kv,220kv,500kv power cable capacity, output(km),price, cost, profit(10K yuan/km),output value(10K yuan)and profit margin
Table List of Year 2009-2013 Fujikura power cable 1kv-35kv,110kv,220kv ,500kv capacity , output(km) and growth rate
Table  List of 500kv EHV XLPE power cable project opportunities and risks
Table List of 500kv EHV XLPE power cable project equipment and the amount of investment in fixed assets
Table List of 500kv EHV XLPE power cable project feasibility Analysis
Table List of 500kv high voltage power cable project main equipment (including quantity, unit price, place of origin)
Table List of 500kv high voltage power cable project main raw materials(including quantity, unit price, money amount)
 

【编辑:中国投资政策网】 TOP
专项定制报告专项定制报告分类
专项报告类别:
商业计划书 | 可行性研究报告 | 资金申请报告
可行性报告 | 项目申请报告 | 英文报告
联系方式
·联系人:
余先生、方小姐
·电话号码:
15989039303、(0086)020-28908140
·地址:
广州市番禺区桥南街福德路241号奥园广场塔三1305室

订购流程订购流程
① 签订可行性报告订购合同;
② 通过银行转帐、邮局汇款等形式款项;
③ 中国投资策划网见到汇款底单或者转帐底单后,24小时内发送可行性研究报告电子版,72小时内寄送正式版以及发票。